2 Harbour Green - Exterior Restoration
Located in stunning Coal Harbour, 2 Harbour Green is a 30 floor condo building boasting 71 units including 9 townhomes. Construction was completed in 2008, and has panoramic views of Coal Harbour, Stanley Park, the Burrard Inlet and the North Shore Mountains.


2 Harbour Green
Project Details:
Access Plan: Swing stage and rope access (bosun's chair)
Preparation:
Painting: MPI Standard
Concrete Repairs: ACI 562
Balcony Traffic Membrane: Complete removal of existing to bare concrete
Products Used:
Sherwin Williams Loxon High Build Waterproofing Masonry Coating
Sika Masterseal M1500 Traffic Membrane System
Duration: 2 years (operating in approved weather conditions only)
Challenges:
Extensive concrete spall and crack repairs
Custom installed tiles on balcony surfaces required removal
Contractor worked all 4 sides of the building concurrently requiring high levels of communication from the inspector to ensure standards were equally met.